AMENDMENT TO NOTICE OF INVITATION FOR BIDS
This advertisement is to notify an amendment of the Notice of Invitation for Bids for the Continuation of Construction Works of Iteya – Robe – Seru, Lot 2: Robe – Seru Road Project that has been published on the Ethiopian Herald Newspaper, dated September 25, 2020 and September 26, 2020.
The Amendments are the following:
1.The Estimated Length of the project shall be amended as:
Package III |
||||||
Item No.
|
Project Name
|
Estimated Length (Km)
|
Pavement Type
|
Project Duration |
Contract Delivery |
Procurement Type
|
1 |
Continuation of Construction Works of Iteya-Robe-Seru Road Project; Lot II: Robe-Seru(Km 75+600-Km 143+875) |
69.5 |
AC |
3 Years |
DBB |
ICB
|
2. In Item No.4 under table 1.1 of the Annual Construction Turnover, Liquid asset /Cash Flow and Specific construction projects experience Criteria’s for the above project are amended as follows:
1.1 Continuation of Construction Works of Iteya-Robe-Seru Road Project: Lot II:Robe-Seru (Km 75+600Km 145+075)
Item/ No
|
Qualification Criteria
|
Minimum Requirement
|
||
Local Bidders
|
Foreign Bidders
|
|||
1 |
Annual Construction Turnover for the Last Five Years
|
ETB 394 Million (Peak)
|
ETB 985 Million (Average)
|
|
The annual construction Turnover (ACT) requirement for a Joint Venture (JV) of Local and Foreign Firms is ETB 739 Million (Average) |
||||
2 |
Liquid Asset/Cash Flow Requirement |
ETB 123 Million |
ETB 164 Million |
|
3 |
General Construction Experience |
2 years firm experience under construction contracts in the role of Contractor, Joint Venture partner or sub-contractor. |
5 years firm experience under construction contracts in the role of Contractor, Joint Venture partner or sub-contractor.
|
|
4 |
Specific Construction Project Experience |
A minimum One (1) any type of asphalt As (DBST, TST or AC) road construction / upgrading / rehabilitation Project with a value of ETB 1.034 Billion; OR A minimum Two (2) any type of (DBST, TST or AC) road construction upgrading / rehabilitation Project each with a value of ETB 517 Million; OR A minimum Three (3) any type of asphalt (DBST, TST or AC) road construction / upgrading / rehabilitation Project each with a value of ETB 344 Million; In all cases, the projects shall be within the last ten (10) years that have been successfully and substantially completed (70% Completed).
|
A minimum of Two (2) asphalt Concrete road constructions/ upgrading / rehabilitation projects each with a value of ETB 1.478 Billion asphalt within the last ten (10) years / that has been successfully and substantially complete(80% Completed).
|
|
5 |
Grade |
RC – 1 or GC-1 |
|
|
Whereas, the remaining provisions/ information of the previously issued/published Notice of Invitation shall remain unchanged.